Siemens – El Sewedy PSP – 4800MW Combind Cycle Power Plant -Beni Suef :
Supply and install all electrical works of BOP ,Gas and steam Turbines..President El Sisi and German Prime Minister Angela Merkel inaugurated the Beni Suef power station in Ghayada[/vc_column_text][/vc_column][vc_column width=”1/2″][image_with_animation image_url=”1790″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][image_with_animation image_url=”1793″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][vc_column width=”1/2″][vc_column_text]
Power Plant # 1(owner-S&W Sterling and Wilson – Shapoorji ) :BenBan Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite(2018):
Scope of Work : (Construction of All Civil Works – (Roads , Fences, Buildings , and Foundation ,Electro Mechanical Works Installation& Commissioning).[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_column_text]
Power Plant # 2(Owner- ALFA SOLAR –AL FANAR) :BenBan Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite :
Scope of Work (2018): (Construction of All Civil Works – (Roads , Fences, Buildings , and Foundation ,Electro Mechanical Works Installation& Commissioning).[/vc_column_text][/vc_column][vc_column width=”1/2″][image_with_animation image_url=”1796″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][image_with_animation image_url=”1818″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][vc_column width=”1/2″][vc_column_text]
Power Plant # 3(Owner- ELSEWEDY/ Tüv ) :BenBan Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite :
Scope of Work (2018-2019): (Construction of All Civil Works – (Roads , Fences, Buildings , and Foundation , Mechanical Works Installation& Commissioning).[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_column_text]
Power Plant # 4(Owner- GE(Genaral Electric )/Fas ) :BenBan Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite :
Scope of Work (2018-2019):
(Mechanical Works Installation& Commissioning).
[/vc_column_text][/vc_column][vc_column width=”1/2″][image_with_animation image_url=”1817″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][divider line_type=”No Line” custom_height=”10px”][image_with_animation image_url=”1820″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][vc_column width=”1/2″][vc_column_text]
Power Plant # 5:(Owner- Al own/ Acwa power ) : Al resha (Jordan) Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite (2019):
Scope of Work (2018-2019):
(Mechanical Works Installation& Commissioning).[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_column_text]
Helwan Machinery and Equipment Company-(Factory 999)Consultant USDC :Urban Studies and Design Center ,Main Contractor ENDECO
Renovation of Galvanization Factory 999.
( Pictures Before renovations)[/vc_column_text][/vc_column][vc_column width=”1/2″][image_with_animation image_url=”1822″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][image_with_animation image_url=”1823″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][vc_column width=”1/2″][vc_column_text]
Ataka Power station with ( Al Hashmia & EL Sewedy)(Cont.)
2015:
- Two turbines with 160-Megawatt transfer capability.
- Mounting and wiring Electrical Boards and Cables for the control Building.
[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_column_text]
ERC Egyptian Refining Company GS -HCC,Refinery Project Tie-In Unit, Mostorod ,Cairo
construction of Tie in pipe rack.[/vc_column_text][/vc_column][vc_column width=”1/2″][image_with_animation image_url=”1824″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][image_with_animation image_url=”1825″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][vc_column width=”1/2″][vc_column_text]
AlMarasem con. – Blanka , North Cost :
Project Manager Consultant: Turner Consultant : ACE – Moharram Bakhoum – Main Contractor – AlMarasem:
Mechanical Works for Buildings about 372 chalet :
-Plumbing
-HVAC
Balnka 2: About 11 Chalet each contain 16 units (176 unit Total)
Blanka 3 : About 5 Chalet each contains 8 units (40 unit Total)
26 Chalet each contains 6 units ( 156 unit Total)[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_column_text]
AlMarasem con. – Mivida Parcel 23, New Cairo:
Mechanical Works for 6 Buildings about 208 apartment:
-Plumbing
-HVAC[/vc_column_text][/vc_column][vc_column width=”1/2″][image_with_animation image_url=”1826″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][image_with_animation image_url=”1827″ animation=”Fade In” img_link_large=”yes” img_link_target=”_self”][/vc_column][vc_column width=”1/2″][vc_column_text]
DP World (Ain Sokhna Port)
Carrying out civil works in Ain Sokhna port, involving the demolition and re-erection of the Gate House, the bawdry wall, and the access road to the port.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_column_text]
E.H.C. (Egypt Hydrocarbon Corporation Company) 2012:
Carrying out civil works in evaporation pond (water structure), involving Supply & cast:
- 100m3 plain concrete
- 250m3 reinforcement footing
- 350m3 reinforcement concrete walls with 3m high
Supply & apply chemical isolation (using Sika top seal 107)
Supply & install of 12’000 m2 H.D.P.E. sheets for water insulation..[/vc_column_text][/vc_column][vc_column width=”1/2″][divider line_type=”Full Width Line” custom_height=”60px”][image_with_animation animation=”Fade In” img_link_large=”yes” img_link_target=”_self” image_url=”1875″][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][divider line_type=”Full Width Line” custom_height=”60px”][image_with_animation animation=”Fade In” img_link_large=”yes” img_link_target=”_self” image_url=”1873″][/vc_column][vc_column width=”1/2″][vc_column_text]
E.H.C. (Egypt Hydrocarbon Corporation Company) (Cont.) 2012:
Carrying out many miscellaneous works involving supply & install:
- 2000 liner meter chain link fence
- New water tank for training center building including:
- P.R. Water supply piping
- Well water H.D.P.E. Pipes (500 liner meter)
- Main electrical distribution board and cables for the training
center building
- Earthling systems
- 5000 liner meter steel razor wire above the main fence
- 5000 liner meter rigid steel conduits for fiber optics
[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_column_text]
Wadi El Nile Cement Factory – Consultant : Reliance Heavy Industries – RHI:
Fire Fighting net work For coal Store[/vc_column_text][/vc_column][vc_column width=”1/2″][divider line_type=”Full Width Line” custom_height=”60px”][image_with_animation animation=”Fade In” img_link_large=”yes” img_link_target=”_self” image_url=”1871″][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][divider line_type=”Full Width Line” custom_height=”60px”][image_with_animation animation=”Fade In” img_link_large=”yes” img_link_target=”_self” image_url=”1869″][/vc_column][vc_column width=”1/2″][vc_column_text]
Bin Laden Con. – AL Azhar Mosque Renovation ,Cairo :
EXTERNAL ENVIRONMENTAL UTILITIES:
Storm Network, Water Network, Fire Network, Sewage Network, Irrigation Network
INTERNAL MECHANICAL WORK:
Ventilation, Air Conditioning, Plumbing
Al Azhar Mosque Toilet Building:
Plumbing, Fire Fighting, HVAC[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column width=”1/2″][vc_column_text]
Danieli Construction – In ELEzz Steel Factory at El Ain EL Sokhna 2013:
Carrying out several services at El Ezz Steel Factory in Ain el Sokhna, such as:
- Erection of steel fence and surveying works
- Installation of water and sewerage networks
- Erection of prefabricated offices
- Implementation of electrical networks
- Development, implementation and commissioning of
plumbing systems
- Earth leveling and elevation of bench marks
- Reinforced concrete works
- Painting of the network piping
- And manpower supply.