Before Photo Voltaic Solar Power Plants After
Before BenBan Solar Park After
1.Power Plant # 1(owner-S&W Sterling and Wilson – Shapoorji ) :BenBan Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite(2018) :
Scope of Work : (Construction of All Civil Works – (Roads , Fences, Buildings , and Foundation ,Electro Mechanical Works Installation& Commissioning).






2.Power Plant # 2(Owner- ALFA SOLAR –AL FANAR) :BenBan Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite :
Scope of Work (2018): (Construction of All Civil Works – (Roads , Fences, Buildings , and Foundation ,Electro Mechanical Works Installation& Commissioning).




3.Power Plant (Owner- ELSEWEDY/ Tüv ) :BenBan Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite :
Scope of Work (2018-2019): (Construction of All Civil Works – (Roads , Fences, Buildings , and Foundation , Mechanical Works Installation& Commissioning).




4.Power Plant (Owner- GE(Genaral Electric )/Fas ) :BenBan Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite :
Scope of Work (2018-2019):(Mechanical Works Installation& Commissioning).



5.Power Plant # 5:(Owner- Al Own/ Acwa power ) : Al resha (Jordan) Solar Plant 62 MW –PV (Photo Voltaic ) Area of 1 Million m² – 200,000 PV Unite (2019):
(Mechanical & Electrical Works Installation& Commissioning).




6.Power Plant # 6:(ABYDOS) : Egypt 500 MW KOMOMBO Solar Photovoltaic Power Plant (2024):
(Mechanical & Electrical Works Installation& Commissioning).




https://www.instagram.com/ameapower/reel/DC815U0P6nC




7.Power Plant # 7: 350 MWp Solar Photovoltaic (PV) at Scatec’s Power Plant in Qena :
(Electro-Mechanical Installations & Commissioning).
Five Builders has successfully installed and commissioned one third of Scatec’s 1.1 GW utility-scale solar PV plant with a 100 MW / 200 MWh battery energy storage system (BESS) in Qena Governorate, Egypt. This project is considered one of Africa’s largest hybrid renewable energy projects. It will provide more than 3 TWh of clean electricity annually, improve grid stability, and support Egypt’s transition to a more sustainable and low-carbon energy sector.